Every Vent, Pipe, and Conduit Is a Hole Somebody Made Later
An exterior wall is designed as a continuous system. The weather barrier is continuous, the air barrier is continuous, and where the design is good, the drainage path behind the cladding is continuous too.
Then the building gets occupied, and for the next thirty years trades cut holes through it.
The pattern behind the problem
A dryer vent is installed. A split system goes in and refrigerant lines pass through the wall. A satellite dish is mounted. Telecom cable is run. A light fixture is added beside an entry. An exhaust fan is replaced and the new one has a different footprint.
Each of those is a penetration through the building envelope, and each was made by somebody whose expertise is the equipment rather than the wall. The mechanical contractor knows ducts. The electrician knows conduit. Neither was engaged to detail a hole through a drained wall assembly, and typically neither was asked to.
So the hole gets closed with what is available, which is usually sealant, and the building acquires another leak path that will surface in five to ten years.
This is the same organizational failure described in the post on rooftop equipment and membrane penetrations, applied to walls instead of roofs.
What the detail should include
A properly detailed penetration has several elements, and sealant is the last of them.
A sleeve or formed opening that gives the penetration a defined edge rather than a ragged hole.
Continuity of the weather barrier around the opening. The barrier is lapped and sealed to the sleeve so that water travelling on the barrier passes around the penetration rather than into it.
Drainage provision above it on a drained wall. Water arriving in the cavity above a penetration has to get past it, and a penetration that dams the cavity is worse than the hole itself. This is the same principle as the cavity drainage described in the post on blocked weep holes.
An exterior sealant joint designed as a joint, with the geometry and backing set out in the post on sealant joint design, rather than a bead pressed into a gap.
Continuity of the air and vapour control layers on the interior side. A penetration that leaks air carries moisture into the assembly, which produces the interstitial condensation covered in the guide on interstitial condensation.
Most penetrations on most buildings have the fourth item and none of the others.
Slope, and the ducts that point the wrong way
Pipes and ducts passing through a wall should slope outward, so that any water inside them drains to the exterior.
A duct sloping inward delivers water directly to the interior of the wall or the suite. It is among the most common defects found on exhaust penetrations, and it is entirely a matter of how the duct was set when it was installed.
It is also easy to check. On an exhaust penetration, water appearing at the interior after wind-driven rain, with no other apparent source, frequently means the duct is sloping the wrong way. The related issue at exhaust terminations is covered in the post on dryer vent and exhaust penetration sealing.
Abandoned penetrations are pure liability
Buildings accumulate holes for equipment that no longer exists. Old satellite mounts, disused vents from replaced appliances, conduit from removed signage, brackets from equipment that was upgraded.
These get covered with a plate, or a bead of sealant, or nothing, and then forgotten. A penetration with no remaining function has one remaining role, which is admitting water.
Properly closing an abandoned penetration means making the wall continuous again: filling the opening with compatible material, restoring the weather barrier, and finishing the exterior to match. Covering it with a plate is not that, and a plate fixed to a wall introduces its own fasteners, each of which is a small penetration.
Auditing them
Most buildings have never had a systematic penetration audit, and the exercise reliably finds items nobody in current management knew about.
The method is straightforward: work elevation by elevation, record every penetration with its location, what it serves, and the condition of its detail. Photograph each one. Flag anything abandoned, anything sloping inward, anything where sealant is the only defence, and anything that appears to interrupt cavity drainage.
The output is a list that supports a repair scope and, more usefully, becomes a permanent record for the building. Any future equipment installation can then be checked against it.
On a mid or high-rise this needs the same access as any facade work, which is the reason it does not get done on its own.
Air leakage matters as much as water
Penetrations are usually discussed as water entry points, and on a Metro Vancouver building the air leakage through them does comparable damage by a slower route.
Air moving through a gap around a duct or a conduit carries water vapour with it. When that air reaches a cold surface inside the wall assembly, the vapour condenses there, in a location with no drainage and no way to dry. The result is the interstitial condensation described in the guide on interstitial condensation, concentrated at the penetration.
This is why the air barrier continuity on the interior side of a penetration matters as much as the sealant on the exterior. A penetration that is watertight outside and open to air movement inside is still delivering moisture into the assembly, and the damage appears as deterioration behind the cladding rather than as a visible leak.
On a building with recurring condensation problems in the same locations, the penetrations in those areas are worth checking before anything more elaborate is investigated.
The equipment that gets replaced
Exhaust fans, heat pumps, and telecom hardware get replaced on shorter cycles than buildings do, and each replacement is an opportunity for the detail to get worse.
A new unit with a different footprint leaves part of the original opening exposed, and the gap gets filled rather than the opening being properly reworked. A new mounting pattern adds fasteners beside the old ones, which are left in place. Over three equipment generations, a single location can accumulate a dozen redundant holes around one working penetration.
The practical control is a standing requirement in the strata’s contracting practice: any work involving an exterior wall penetration specifies who forms the opening, who details it, who seals it, and that redundant openings are closed properly rather than covered. That clause costs nothing and it prevents the accumulation.
It also applies to work commissioned by individual owners, which is the harder half. A resident arranging a split system installation is not thinking about the weather barrier, and a bylaw or an alteration agreement requiring envelope penetrations to be detailed by an approved party is the mechanism most stratas lack.
Bundle it into a project that is already up there
Penetration detailing is inexpensive as an item within a recaulking or facade restoration project, and disproportionately expensive as individual jobs at height, for the reasons set out in the post on balcony slab edge and drip edge details: access and setup dominate the cost of small work on a tall building.
A recaulking scope that covers the joints and leaves the penetrations as found has addressed part of the problem and left the rest. Adding penetration remediation to that scope costs a fraction of what it would cost alone.
The other half of the fix is forward-looking. Any future work involving an exterior wall penetration should specify who makes the opening, who details it, and who is responsible for it, before the equipment supplier is engaged. That single clause prevents the next twenty years of the same problem.
Sources and further reading
- BC Housing, Building Enclosure Design Guide, penetration detailing and continuity of control layers, referenced 2026
- Canada Mortgage and Housing Corporation, Best Practice Guide: Wood-Frame Envelopes in the Coastal Climate of British Columbia, referenced 2026
- ASTM International, ASTM C1193 Standard Guide for Use of Joint Sealants, referenced 2026
- Allweathercoating facade assessment records, Metro Vancouver, 2026
Frequently Asked Questions
More from Sealant & Caulking Guide
A Sealant Joint Fails Because of Its Shape, Not Its Brand
Two buildings using the same premium sealant get different results. The one that lasts had the right joint width, the right depth, and a backer rod doing its job.
Read article →Resealing Windows Buys Time. It Does Not Fix a Failed Window
Two Vancouver towers with the same leak symptom need opposite answers. One needs a caulking programme, the other needs new windows, and the difference is in where the water enters.
Read article →Storefront Glazing: Why Ground-Floor Retail Leaks Differently
A storefront takes splash from the sidewalk, door slams all day, and pressure washing at street level. Its sealant fails faster than anything higher up the building.
Read article →