Parkade Ramps Wear Out Faster Than the Rest of the Deck

Published: By: · SPRAT/IRATA certified · 40+ yrs Metro Vancouver Save
A technician applying liquid waterproofing membrane across a concrete deck at dusk with the surrounding trees and inlet visible beyond the parapet.
Written by: Allweathercoating Technical Team
SPRAT- & IRATA-certified · 40+ years Metro Vancouver building envelope experience ·

Walk into any parkade in Metro Vancouver that is more than fifteen years old and look at the ramp. Then look at a parking stall in the corner of the same level.

They were almost certainly coated at the same time with the same material. They are in visibly different condition, and the difference is not close.

The traffic count nobody calculates

A parking stall sees one vehicle arrive and one vehicle leave each day, and spends the rest of the time under a stationary load.

The ramp sees every vehicle in the building, in both directions, every day. On a hundred-unit building that is a traffic count on one strip of concrete that no individual stall approaches. The ramp is the busiest surface in the structure by an order of magnitude, and it is routinely specified as though it were not.

Shear is the force that matters

Traffic volume alone would not explain the difference. The mechanism that does is shear.

When a vehicle sits in a stall, it applies a vertical load. The coating is pressed against the concrete, which is the direction a bonded coating handles best.

When a vehicle turns, brakes, or accelerates, the tyre applies a horizontal force at the surface. That force tries to slide the coating sideways off the substrate rather than press it into it, and it is the force most likely to break the bond between the two.

Ramps are where all three of those actions happen. Vehicles accelerate to climb, brake to descend, and turn at the top and bottom, often within a short run. The turning circle at the head of a ramp, where drivers crank the wheel while barely moving, is the single most aggressive spot in most parkades, and it is usually the first area to show bare concrete.

This is why a system that performs adequately across a flat deck can fail early on a ramp. It is not being asked to do the same job.

Chlorides arrive here first

Metro Vancouver salts its roads during cold snaps, and every vehicle that drives on those roads carries chloride into the building on its tyres and underbody.

That contamination is deposited where the vehicle first enters and where it slows and turns, which is the ramp. The ramp therefore carries the highest chloride load in the parkade, on top of carrying the highest traffic.

Chlorides penetrate concrete and attack the passive layer protecting the reinforcing steel, initiating the corrosion process described in the post on rebar corrosion and concrete delamination. Corroding steel expands, and the expansion cracks the concrete from the inside.

An intact, correctly specified coating is the barrier that keeps chlorides out of the concrete in the first place. A worn coating on a ramp is not merely a cosmetic issue: it is an open path for the contaminant that does the most structural damage, at the location that receives the most of it.

Slip resistance wears out where it is needed most

Traffic coatings get their texture from aggregate broadcast into the wet material during application. That aggregate is what stops a wet sloped surface from being dangerous.

It also wears away under traffic, fastest where traffic is heaviest, which on a ramp means the wheel paths and the walking route beside them. A ramp that has gone smooth in the tracks is a sloped surface, frequently wet from vehicle drip-off, used by pedestrians and by drivers stepping out of cars.

This is worth inspecting specifically rather than noticing during a general walk-through, and it is one of the more defensible reasons to bring forward a ramp recoat ahead of the rest of the deck.

Specifying the ramp separately

The practical answer to all of the above is to treat the ramp as its own area in the specification.

That can mean a heavier build-up of the same system, with additional coats and a thicker wear layer. It can mean a different product entirely, formulated for high-wear vehicular areas. The comparison between the main product families is set out in the post on PMMA versus polyurethane traffic membrane, and the balance of properties that suits a flat deck is not automatically the one that suits a ramp.

Application matters too. Liquid-applied materials behave differently on a slope, and a product formulated for flat work can sag or run before it cures. Ramp work needs both the right grade of material and an applicator who has done it before.

Where the ramp is exterior or partly exposed, which is common on the entry section, add weather and UV exposure to the list of conditions the specification has to cover.

Recoating on its own cycle

Because the ramp wears faster, the sensible plan is to recoat it on a shorter interval than the flat areas, rather than synchronizing everything.

Replacing the entire deck early to catch the ramp wastes most of the flat-area coating’s remaining life. Waiting for the flat areas to reach the end of their life means running the ramp to bare concrete, and once chlorides are in the slab the repair scope shifts from recoating to concrete restoration, which is a different order of cost entirely. The scheduling logic is set out in the post on parkade membrane and traffic coating recoat schedules.

The signals to watch are specific to ramps: bare concrete appearing in the wheel paths rather than uniformly, loss of surface texture in the tracks, cracking that follows the traffic lanes, and debonding at the edges of worn patches.

Drainage on a slope behaves differently

A ramp is a sloped surface, so water runs off it rather than ponding, which sounds like an advantage and creates its own problems.

The water has to go somewhere, and on most parkades it goes to the bottom of the ramp. That low point receives the runoff from the whole ramp plus whatever the vehicles carried in, and it is where the chloride concentration is highest in the entire structure.

A trench drain or a catch basin at the base of the ramp is standard, and its condition governs a great deal. When it blocks, the water stands at the bottom of the ramp, in the location that already has the highest chloride load and the heaviest turning traffic.

Clearing that drain belongs on the maintenance schedule with the same priority as the roof drains, and it is frequently left off because it is in a parkade rather than on a roof.

Coating the joint between ramp and slab

Where the ramp meets the flat deck at the top and bottom, there is a change in plane, and changes in plane are where coatings fail.

The material has to turn a corner and stay bonded through it, on a surface that flexes differently on either side of the transition. Vehicles cross that line at every trip, applying the shear described above precisely at the point where the coating is most vulnerable.

Correct practice reinforces the transition, either with additional coats, a reinforcing fabric, or a detail specified by the manufacturer for changes in plane. Skipping that reinforcement is invisible at handover and shows up as a line of failure across the ramp within a few years.

The same applies at any expansion joint the ramp crosses, where the assembly has to accommodate movement rather than resist it, using the systems described in the post on parkade expansion joint systems.

The coordination problem

On most buildings the ramp is the only vehicle access, which makes this the hardest small project a strata will run.

The work has to be phased so a lane stays open, which extends the schedule and complicates the application, or the parkade closes and alternative parking is arranged for every resident. Both options require far more communication than the size of the job suggests, along the lines set out in the post on resident communication during envelope restoration.

Cure times drive the schedule here more than application time does. A product that can take traffic sooner may cost more per square metre and still be the cheaper option once the disruption is counted, and that trade-off should be part of the tender comparison rather than an afterthought.

The ramp is a small part of the parkade by area and a large part of it by consequence. It is worth pricing that way.


Sources and further reading

  • Canadian Standards Association, CSA S413 Parking Structures, durability and protection requirements, referenced 2026
  • American Concrete Institute, ACI 362.1R Guide for the Design and Construction of Durable Concrete Parking Structures, referenced 2026
  • BC Housing, Building Enclosure Design Guide, traffic-bearing membrane provisions, referenced 2026
  • Allweathercoating parkade assessment records, Metro Vancouver, 2026

Frequently Asked Questions

Why do parkade ramps wear faster than the parking areas?

Every vehicle entering or leaving the building uses the ramp, so the traffic count on that area is many times higher than on any individual parking stall. Vehicles also accelerate, brake, and turn on ramps, which applies shear forces that a car sitting in a stall does not.

What is shear and why does it matter for coatings?

Shear is the horizontal force a tyre applies to the surface when a vehicle turns, brakes, or accelerates. It tries to slide the coating sideways off the concrete rather than press it down, and it is the force most likely to break the bond between a coating and its substrate.

Should ramps have a different coating from the flat deck?

Generally yes, either a heavier build-up of the same system or a different product specified for high-wear areas. Applying the flat-deck specification across the ramp saves money at installation and produces a surface that needs replacing much sooner than the rest of the deck.

What does road salt do to a parkade?

Chlorides carried in on vehicles during winter penetrate the concrete and attack the reinforcing steel, causing corrosion that expands and cracks the concrete from within. Ramps receive the highest chloride load in the building because every vehicle passes over them first.

Why does slip resistance matter more on a ramp?

A sloped surface that is wet from vehicle drip-off is where people are most likely to slip, both pedestrians walking the ramp and drivers stepping out. Aggregate broadcast into the coating provides the texture, and it wears away fastest exactly where traffic is heaviest.

How do I know if a ramp coating is failing?

Look for worn-through areas showing bare concrete in the wheel paths, loss of the textured surface, cracking that follows the traffic lanes, and debonding at the edges of worn patches. On ramps these appear in tracks rather than uniformly across the surface.

Can just the ramp be recoated?

Yes, and it often should be, because the ramp reaches the end of its life before the flat areas do. Recoating the ramp on its own cycle is usually more economical than either replacing everything early or letting the ramp fail while waiting for the rest.

How is the building affected during ramp work?

Significantly, because the ramp is the only vehicle access on most buildings. The work has to be phased so at least one lane stays open, or scheduled with the parkade closed and alternative parking arranged. That coordination is often the hardest part of the project.

Does the slope affect the coating application?

It does. Liquid-applied products behave differently on a slope than on a flat surface, and material can sag or run before it cures if the wrong grade of product is used. Ramp application requires products formulated for sloped work and applicators who have done it.

How long should a ramp coating last?

Less than the flat deck in the same building, and how much less depends on the traffic volume, the system specified, and how well the drainage keeps water off the surface. Tracking when the wheel paths start to show is more useful than any general figure.